Home > Stochastic Forecasts > Efficient Frontier > Minimum / Maximum Constraints

Minimum / Maximum Constraints

 

If an efficient frontier is being calculated, the Minimum/Maximum Constraints topic indicates the range of the desired allocation for each asset class. For a leveraged frontier, at least one minimum constraint should be negative. To calculate the expected mean and standard deviation for a given asset mix, simply set both constraints equal to the allocations for the mix.